2501 N. Highland Ave. Fresno, CA 93727  |  559-327-9000
Popular Links

Impact of Facility Bonds

Home  \  About Us  \  Impact of Facility B...
“Maximizing Achievement for All Students,” means making sure that every school, no matter when it was built, is a high-quality learning environment where students can do their best.

Measure A is on the November 2024 ballot. If passed, the final phase of our new high school could be completed, alleviating a student-housing problem in the secondary level that would otherwise have to be resolved by busing, boundary changes or double sessions.

FACT: Clovis East High is overcrowded, with 5,000+ students on a campus built for 4,000. In 2020, the community supported building Clovis South High in order to ease overcrowded conditions. Plans and a budget were developed for Clovis South (located on the Terry Bradley Educational Center along with Sanchez Intermediate) before the pandemic. No one could have known that an unprecedented post-pandemic inflation of construction prices – more than 40% jumps in some material and labor costs – would create a funding gap, but it did.

Students, already impacted during the pandemic, may feel the effects again should the final phase of Clovis South High not be completed.


Over time, our schools have benefited from community support of facility bond measures in many ways, allowing us to continue to have modern, well-maintained campuses around Clovis Unified.

Every school facility in Clovis Unified has benefited from bond projects not once or twice, but many times over. Across the District, bond funds have been used for:
  • Fixing leaking roofs, electrical wiring, fire safety doors and smoke alarms
  • Repairing and upgrading deteriorating science, engineering and math classrooms to provide modern learning spaces at all of our schools
  • Building new schools and adding space at existing schools to reduce overcrowding
  • Building new performing arts and athletic spaces and upgrading others
  • Making needed updates to facilities to provide safe, clean drinking water
  • Improving school safety and security by updating communication systems and security systems
  • Maintaining equitable facilities at schools of all ages through modernization and maintenance projects
  • And many, many other upgrades and repairs
Many people don’t realize that as of 2024, our community has a lower tax rate on school bonds than it did in 2020, 2010 or even 2000. They also don’t know that Clovis Unified residents pay a lower tax rate than people living in neighboring school districts like Fresno, Sanger and Central. Learn more about our facilities program and the use of facility bonds in Clovis Unified at www.cusd.com/Facilities.aspx
Clovis Unified School District: Be the best you can be in mind, body, and spirit
Buchanan Area Schools
Buchanan link image Alta Sierra link image Cole link image Century Elem logo with "C" and Tiger Dry Creek link image Garfield Elementary Logo Tarpey link image Woods link image
Clovis High Area Schools
Clovis High link image Clark link image Cedar Wood link image Clovis Elementary link image Mickey Cox link image Gettysburg link image Jefferson link image Red Bank link image Sierra Vista link image Weldon link image
Clovis West Area Schools
Clovis West link image Kastner link image Ft. Washington link image Liberty link image Lincoln link image Maple Creek Nelson link image Pinedale link image Valley Oak link image
Clovis North Area Schools
Clovis North link image Bud Rank link image Copper Hills Fugman link image Mountain View link image River View link image
Clovis East Area Schools
Clovis East wolf logo Freedom link image Miramonte link image Oraze link image Reagan Elementary link image
Clovis South Area Schools
TBEC Logo Boris Chargers logo Fancher Creek Logo Hirayama Logo TK Logo Young logo
Educational Services Area Schools
CART link image Gateway link image Clovis Online School link image Clovis Community Day School link image Clovis Adult Education link image Sierra Outdoor link image
View text-based website